China sourcing

Importing from China to Togo

Ports, realistic transit times, the documents customs will ask for, and the mistake that costs importers in Lomé the most time.

Sea freight

30 to 45 days

Ports: Lomé

Air freight

5 to 11 days

Airport: Gnassingbé Eyadéma International Airport, Lomé

These are typical port-to-port and airport-to-airport ranges for the Togo route. They are not a quotation, and they do not include production or customs clearance.

Peak season before Chinese New Year, port congestion and vessel roll-overs all push these numbers up. Plan with the top of the range, not the bottom.

Why this route works the way it does

Lomé plays two roles at once: transhipment hub for West Africa, and sea outlet for the Sahel, with Burkina Faso, Mali and Niger making up more than 90% of the port's transit traffic for several years now. On the paperwork side, Togo runs on the BESC, the electronic cargo tracking note, in place since 2001 and managed on the state's behalf by a delegated operator. You arrange it before loading, not on arrival.

Which port can actually receive your ship

Draft is not your problem here, which is rare in the region. Lomé Container Terminal, concessioned to an MSC subsidiary, has 1,050 metres of quay across three berths, a basin depth of 16.60 metres and around ten super-post-panamax gantry cranes; the operator advertises vessels of up to 14,000 TEU. But there are two container operators at the port, LCT and Togo Terminal (AGL group), and how your container is handled depends on which of them discharges it: ask which one before you book, and get your free days confirmed in writing. Finally, do not read the port's record traffic figures as a promise about lead time: most of that volume is transhipment that never enters Togolese customs.

Currency and regional trade rules

The currency will not move: the West African CFA franc stays pegged to the euro at a fixed rate, and only the dollar leg of your purchase floats. What has moved is the regional framework. Burkina Faso, Mali and Niger left ECOWAS at the end of January 2025 while staying inside UEMOA and on the same currency: the corridor is still one currency area, but common customs membership can no longer be taken for granted. If your goods leave Lomé for Ouagadougou, Bamako or Niamey, have the transit regime that will apply confirmed in writing rather than assuming it.

What catches importers out on this route

The real Togolese bottleneck is not the BESC but the prior import declaration certificate for “sensitive products”: cement and clinker, rebar, sheet metal, PVC pipe, plastic bags, rice, vegetable oil, drinks. You get it from the Direction générale du commerce, it is valid for three months, and the platform quotes 72 working hours once the file is complete. What makes it unusual: you have to show a local purchase contract covering a minimum share of the volume you import, around a quarter for rice and oil, close to a third for the rest. Have the thresholds currently in force confirmed.

How the process actually works

  1. 1Define the product precisely: specification, materials, packaging, quantity and target unit cost. Vague briefs are the single biggest source of wrong goods arriving.
  2. 2Identify and verify suppliers. Company registration, export history and factory type matter more than a polished profile page.
  3. 3Sample and approve before production. Approving a physical sample gives you something concrete to inspect against later.
  4. 4Inspect before the goods leave China. Once a container sails, a defect becomes a freight problem instead of a production problem.
  5. 5Book freight and prepare documents together, not one after the other. Missing paperwork is what holds cargo at destination.
  6. 6Clear customs in Togo and arrange the final leg to your warehouse in Lomé.

What drives the cost

  • Volume and weight. Sea freight is priced on the greater of the two, so light bulky goods cost more than their weight suggests.
  • Full container versus groupage. A full container is cheaper per unit, but only if you can actually fill it.
  • Season. Rates rise sharply in the weeks before Chinese New Year and during peak shipping periods.
  • Incoterms. FOB, CIF and DDP shift very different amounts of cost and risk onto you, and quotes are rarely comparable until you check which one you are being given.
  • Duties and taxes at destination, which depend on the HS code of your specific goods.

We deliberately do not publish duty percentages here. They change, they vary by product classification, and an out-of-date figure on a web page can cost you real money. Confirm the rate for your HS code before you commit to a landed-cost calculation.

Documents you will need

  • Commercial invoice
  • Packing list
  • Bill of lading (sea) or air waybill (air)
  • Certificate of origin
  • Any product-specific certificate or conformity document your goods require

The invoice, the packing list and the transport document must describe the same goods in the same terms. Most clearance delays trace back to a mismatch between these three, not to a missing exotic certificate.

How Kuai Sourcing handles this route

We source, verify, inspect and ship as one managed process, so the supplier, the inspection and the freight are not three separate companies blaming each other. Sourcing requests and quotations are free, and you see the landed cost before you commit.

Common questions

How long does shipping from China to Togo take?
Sea freight typically runs 30 to 45 days port to port to Lomé, and air freight 5 to 11 days to Gnassingbé Eyadéma International Airport, Lomé. Production time comes before that and customs clearance after, so plan the whole chain rather than the transit leg alone.
Should I use air or sea freight to Togo?
Sea freight wins on cost for anything heavy, bulky or not urgent. Air freight is worth it for high-value, low-volume goods, for samples, and when a stock-out would cost you more than the freight difference. Many importers ship the bulk by sea and air a small first batch to start selling.
What causes the most delay on this route?
The real Togolese bottleneck is not the BESC but the prior import declaration certificate for “sensitive products”: cement and clinker, rebar, sheet metal, PVC pipe, plastic bags, rice, vegetable oil, drinks. You get it from the Direction générale du commerce, it is valid for three months, and the platform quotes 72 working hours once the file is complete. What makes it unusual: you have to show a local purchase contract covering a minimum share of the volume you import, around a quarter for rice and oil, close to a third for the rest. Have the thresholds currently in force confirmed.
Can I import small quantities to Togo?
Yes. Groupage, also called LCL, lets you pay for part of a container instead of the whole thing. It costs more per cubic metre and usually takes a little longer, because the container waits until it is full, but it makes small first orders realistic.
Which port will goods shipped to Togo actually arrive at?
Draft is not your problem here, which is rare in the region. Lomé Container Terminal, concessioned to an MSC subsidiary, has 1,050 metres of quay across three berths, a basin depth of 16.60 metres and around ten super-post-panamax gantry cranes; the operator advertises vessels of up to 14,000 TEU. But there are two container operators at the port, LCT and Togo Terminal (AGL group), and how your container is handled depends on which of them discharges it: ask which one before you book, and get your free days confirmed in writing. Finally, do not read the port's record traffic figures as a promise about lead time: most of that volume is transhipment that never enters Togolese customs.

Get a quote for your shipment to Togo

Tell us what you want to import. Sourcing requests and quotations are free.